Systems and installation

Your MEP systems need a Chinese design basis.

Your mechanical, electrical and plumbing (MEP) drawings may already define the equipment and routes. Installation in China also requires the seismic, fire and smoke-control interfaces to be resolved.

Compliance with ASCE 7, IBC or NFPA does not establish compliance with Chinese requirements.

Different systems, connected interfaces

Seismic bracing

Restraint for the MEP systems identified by the project’s seismic design. The review covers load paths, structural interfaces and coordination with services.

Fire wrapping

Protective assemblies where the fire design calls for them. The specified application must match the product’s documented performance and installation details.

Composite ducts

Panel-based duct systems selected for their intended service. Panel construction, joints, supports and interfaces require review as a complete assembly.

Smoke curtains

Fixed or deployable barriers that form part of the smoke-control design. Their layout and interfaces follow the project’s approved fire strategy.

Threaded rods, C-channel and a diagonal brace supporting galvanised pipework under a steel roof structure.
The interfaces do not sit inside one product. Restraint, duct construction and penetration protection meet at the same points in the ceiling void, so their scopes are reviewed against each other rather than in turn.

Chinese review differs from home-country acceptance

An assembly accepted under your home-country design basis still needs review for its use in China. A product document alone cannot establish that the installed system satisfies the project’s Chinese requirements.

China’s mandatory seismic framework includes GB 55002-2021. GB 50981-2014 provides the MEP seismic design basis subject to the applicable mandatory requirements. See the code comparison and review questions.

How to coordinate the installation scope

  1. Confirm the Chinese design basis and system scope with the project designer.
  2. Review routes, supports, protective assemblies and smoke-control interfaces together.
  3. Resolve drawing comments and product documentation before the affected work starts.
  4. Agree inspection responsibilities and handover records with the project team.

Common questions

Does a US code design cover all installation requirements in China?

No. Compliance with ASCE 7, IBC or NFPA does not establish compliance with Chinese requirements. The project designer must confirm the applicable Chinese design basis and review each system against it. Installation should follow the project’s approved drawings and product technical documents, with acceptance records agreed before work begins.

Can seismic bracing and fire protection be reviewed together?

Yes. Their interfaces should be reviewed together because supports, anchors, ducts and protective enclosures can occupy the same installation space. That coordination does not make their functions interchangeable. The project designer must retain separate seismic and fire performance requirements, while the installation team identifies clashes and records changes for review before work proceeds.

What should we send before discussing installation?

Send the project type, current design stage, relevant drawings and the design basis used by your international team. Include available Chinese review comments and product technical documents. These records help identify the installation scope and unresolved interfaces. The project designer remains responsible for confirming design requirements and issuing the drawings used for construction.

Bring the unresolved interfaces into view.

Send the drawings and the questions holding up your installation scope.

Discuss your installation scope