Seismic bracing
Restraint for the MEP systems identified by the project’s seismic design. The review covers load paths, structural interfaces and coordination with services.
Systems and installation
Your mechanical, electrical and plumbing (MEP) drawings may already define the equipment and routes. Installation in China also requires the seismic, fire and smoke-control interfaces to be resolved.
Compliance with ASCE 7, IBC or NFPA does not establish compliance with Chinese requirements.
Restraint for the MEP systems identified by the project’s seismic design. The review covers load paths, structural interfaces and coordination with services.
Protective assemblies where the fire design calls for them. The specified application must match the product’s documented performance and installation details.
Panel-based duct systems selected for their intended service. Panel construction, joints, supports and interfaces require review as a complete assembly.
Fixed or deployable barriers that form part of the smoke-control design. Their layout and interfaces follow the project’s approved fire strategy.
An assembly accepted under your home-country design basis still needs review for its use in China. A product document alone cannot establish that the installed system satisfies the project’s Chinese requirements.
China’s mandatory seismic framework includes GB 55002-2021. GB 50981-2014 provides the MEP seismic design basis subject to the applicable mandatory requirements. See the code comparison and review questions.
No. Compliance with ASCE 7, IBC or NFPA does not establish compliance with Chinese requirements. The project designer must confirm the applicable Chinese design basis and review each system against it. Installation should follow the project’s approved drawings and product technical documents, with acceptance records agreed before work begins.
Yes. Their interfaces should be reviewed together because supports, anchors, ducts and protective enclosures can occupy the same installation space. That coordination does not make their functions interchangeable. The project designer must retain separate seismic and fire performance requirements, while the installation team identifies clashes and records changes for review before work proceeds.
Send the project type, current design stage, relevant drawings and the design basis used by your international team. Include available Chinese review comments and product technical documents. These records help identify the installation scope and unresolved interfaces. The project designer remains responsible for confirming design requirements and issuing the drawings used for construction.
Send the drawings and the questions holding up your installation scope.