Smoke curtains
The smoke-zone layout determines the curtain scope.
Your international fire strategy may describe smoke barriers differently from the Chinese drawings. Confirm the barrier function, location and interfaces before selecting a fixed or deployable curtain.
We install the specified curtain assembly within the agreed construction scope.
Fixed compared with deployable curtains
- Fixed curtain
- Remains in its installed position. Coordinate the barrier with ceilings, services, supports and the required clearances.
- Deployable curtain
- Moves into its operating position. Coordinate its movement space, control interfaces, access and functional inspection with the project team.
The project designer selects the type and defines the required performance. Installation details follow the approved drawings and product technical documents.
Translate the function, not only the product name
China’s smoke-zone layout and acceptance arrangements may differ from those in your overseas design. Smoke curtains are not unique to China, but their use must follow the Chinese project’s fire and smoke-control strategy.
An IBC or NFPA design does not establish Chinese acceptance. Confirm the role of GB 50016-2014 and applicable mandatory requirements within the project’s fire design basis.
Review the Chinese and US design-basis comparison.
How to coordinate curtain installation
- Confirm smoke-zone boundaries and the curtain type on the approved drawings.
- Review structural fixing points, ceiling interfaces and service penetrations.
- For deployable curtains, agree movement clearances and control interfaces with the responsible trades.
- Agree installation inspections, applicable functional checks and handover records.
Keep smoke control and fire separation distinct
A smoke curtain does not automatically provide the performance of a fire shutter or fire-separating wall. Resolve any proposed substitution through the project designer.
Coordinate nearby duct systems and fire wrapping so their installation does not obstruct the curtain’s intended function.
Common questions
What is the difference between fixed and deployable smoke curtains?
A fixed smoke curtain stays in its installed position. A deployable curtain moves into its operating position through the specified control arrangement. Both must match the project’s smoke-control design. Selection depends on the required barrier layout, architectural clearance and operating interfaces; the installer should not substitute either type without the project designer’s review.
Are smoke curtains a requirement unique to China?
No. Smoke barriers are used in other jurisdictions too. For a China project, the relevant issue is the locally approved smoke-control strategy and its treatment of smoke zones and barrier interfaces. An overseas layout cannot establish Chinese compliance by itself. Ask the project designer to confirm where curtains are required and which type is specified.
Can a smoke curtain replace a fire shutter?
Do not treat them as interchangeable. A smoke curtain’s specified smoke-control function does not establish the fire-separation performance required of another closure. Any proposed substitution requires the project designer to review the intended function and supporting product evidence. Installation must follow the accepted design, with controls and inspection requirements agreed for that specific application.
Confirm the barrier layout and its interfaces.
Send the smoke-control drawings and the specified curtain type.