Fire wrapping

Specify the fire assembly before selecting the wrapping.

Your fire strategy may call for protected ducts or other service enclosures. The installation must match the intended application and the evidence supporting that assembly.

A material description or an overseas acceptance document cannot define the complete Chinese project requirement.

When wrapping is required

The project’s fire design determines which services need protective wrapping or an enclosure. Confirm the duct or service function, route, required performance and interfaces before selecting a product.

GB 50016-2014, Code for Fire Protection Design of Buildings, is a reference to discuss within the project’s Chinese fire design basis. Its applicability and any superseding mandatory requirements require project-specific review. It is not a complete checklist for every project.

What the assembly includes

Review the wrapping together with joints, supports, access provisions, terminations and penetrations. The approved drawings and product technical documents govern the installation details.

Evidence for a material must not be presented as evidence for every possible assembly. Confirm that the documentation covers the proposed use and configuration.

Fire board panels fitted around a rectangular duct, with board joints and foil-faced insulation visible.
Boards and insulation are one assembly. The board face, the insulation behind it and the joints between boards are reviewed together. A board that meets its own product standard still has to be shown to work as part of this build-up.

NFPA acceptance and Chinese acceptance are separate reviews

NFPA means National Fire Protection Association standards. The applicable requirements depend on the project’s selected standards and design basis.

Compared with acceptance under an overseas fire strategy, the China project requires its own documented review of the fire design and proposed assembly. Compliance with NFPA does not establish compliance with Chinese requirements.

Review the fire and seismic code comparison.

How to review a wrapping proposal

  1. Identify the service and the locations requiring protection on the approved fire drawings.
  2. Confirm the required performance and review the proposed assembly’s technical evidence.
  3. Coordinate supports, access openings, penetrations and adjacent services.
  4. Agree inspection records before the wrapping or surrounding construction conceals the work.

Coordinate wrapping with seismic bracing and duct construction. A change to a support or access detail may require a fresh design review.

Foil tape applied along the joint lines of duct wrapping on site.
Joints and closures are part of the scope. Where the design calls for a sealed facing, the tape line is a performance item rather than a finish. It is checked with the rest of the assembly, not after it.

Common questions

When does a duct need fire wrapping in China?

Fire wrapping is needed where the approved fire design specifies a protective assembly for the duct and its application. The requirement depends on the service, route and fire strategy. Do not select wrapping from the duct material alone. Ask the project designer to confirm the required performance and the assembly details before installation.

Does NFPA compliance make a fire wrapping system acceptable in China?

No. Compliance with the applicable NFPA standards does not establish Chinese acceptance. The project designer must confirm the Chinese fire design basis and assess whether the proposed assembly and supporting documents meet it. The review must address the intended application and installation details, rather than treating an overseas acceptance statement as approval for the China project.

Can fire wrapping replace penetration firestopping?

Do not assume that it can. Wrapping around a service and sealing its passage through a fire-separating element address different interfaces. The approved design and applicable product technical documents must define each treatment and how they meet. Record and resolve any gap between the details before covering the installation or closing the surrounding construction.

Start with the service and the fire requirement.

Send the relevant drawing, proposed assembly and available technical evidence.