Seismic bracing

An ASCE 7 design still needs a Chinese seismic review.

Your headquarters may have completed the restraint design. Before installation in China, the project designer must confirm its compliance with the applicable Chinese seismic requirements.

Compliance with ASCE 7, IBC or NFPA does not establish compliance in China.

The mandatory basis

GB 55002-2021, General Code for Seismic Precaution of Buildings and Municipal Engineering, establishes mandatory seismic requirements. GB 50981-2014, Code for Seismic Design of Mechanical and Electrical Equipment, addresses building MEP seismic design subject to the applicable mandatory framework.

The Ministry of Housing and Urban-Rural Development publication notice identifies GB 55002-2021 as mandatory and explains its precedence where existing provisions conflict.

Read the Ministry’s publication notice for GB 55002-2021.

The notice establishes the regulatory basis. It does not determine the restraint layout for your project. Confirm the applicable design basis with the project designer.

Which systems need review?

The designer should review the project’s pipes, ducts, cable distribution systems and supported equipment for applicable seismic requirements. This is a scope review, not a claim that every service requires the same restraint arrangement.

Restraint details must address the complete load path into the supporting structure. Locations, dimensions, loads and attachment details follow the approved design drawings and product technical documents.

Diagonal seismic bracing with threaded rod and C-channel supporting galvanised pipework beneath a steel structure.
Restraint is reviewed as a system. Anchor, member, clamp and brace are assessed together against the design basis — a component that passes on its own does not establish that the assembly does.

How the Chinese review differs

Design basis
A design prepared to ASCE 7 uses its stated project criteria. Chinese acceptance requires a separate review against the applicable GB framework.
Calculations and details
Do not assume design objectives, calculation methods or attachment details transfer directly. Any equivalence requires project-specific review.
Review comments
The review may ask for a Chinese design basis, a defined restraint scope, supporting calculations and coordinated details. These are review topics, not a prediction of a particular authority’s comments.
Acceptance
Overseas design acceptance does not replace the Chinese project’s inspection, documentation and sign-off arrangements.

Read the GB and US code comparison.

How the review is sequenced

  1. Confirm the applicable Chinese design basis with the project designer.
  2. Identify the systems requiring restraint and document the basis for exclusions.
  3. Resolve calculations, structural attachments and service coordination before the affected installation.
  4. Agree inspection stages, handover records and authorized signatories.

What the handover package should address

Agree the required drawings, revisions, product technical documents, applicable test reports, installation inspections and as-built records. Include concealed-work records where relevant to the installed scope.

The project’s acceptance arrangements determine who inspects and signs. Our installation records and product documentation support that process; they do not replace design review or project acceptance.

Detail of pipe clamps and support members on an installed seismic restraint assembly.
Handover follows the built condition. Where the installed arrangement departs from the drawing, the record should show the departure rather than the original intent.

Common questions

Is seismic restraint mandatory for MEP systems in China?

China has mandatory seismic requirements under GB 55002-2021. GB 50981-2014 addresses MEP seismic design within the applicable Chinese framework. Whether a particular service needs restraint, and how it must be restrained, depends on the project design basis. The project designer must identify the covered systems and document any exclusions before installation.

Does an ASCE 7 seismic bracing design satisfy Chinese requirements?

No. An ASCE 7 design does not by itself establish compliance in China. The project designer must review the Chinese seismic objectives, calculation basis, system scope and acceptance requirements. Existing calculations and drawings can inform that review, but the project needs a documented Chinese design basis and approved installation details before the affected work proceeds.

What documents should be agreed for seismic bracing handover?

Agree the required records with the project team before installation. The proposed package should address approved drawings and revisions, applicable product documents and test reports, installation inspection records, concealed-work records where relevant, and as-built information. The exact package and authorized signatories depend on the project’s inspection and acceptance arrangements; a supplier report alone cannot replace them.

Resolve the restraint scope before installation.

Send your design basis, relevant drawings and outstanding review comments.