Contact
Bring the drawing and the question holding up your project.
Your question may concern a restraint detail, a protective assembly or the records needed before work is concealed. Tell us the project stage and the decision you need to make.
We can discuss installation scope and documentation. Engineering design decisions and design signatures remain with the project designer.
Company contact
Anhui Liangjia Technology Co., Ltd.
安徽省良佳科技有限公司
Hefei, Anhui, China
Email: info@ahliangjia.com
Phone / WhatsApp: +86 139 6569 8861
Questions we can discuss
- What installation scope is shown on the drawings, and where are the interfaces unresolved?
- Which product documents and applicable test reports are available for review?
- How should bracing, ductwork, wrapping and smoke curtains be coordinated on site?
- What installation records should be agreed with the project team before work starts?
How to prepare your inquiry
- State the facility type and whether the work is new construction or an alteration.
- Identify the current design stage and the design basis used by your team.
- Attach the relevant drawings, review comments and available product technical documents.
- Describe the installation question and identify who holds design responsibility.
Compliance with ASCE 7, IBC or NFPA does not establish Chinese compliance. Start with the code comparison if the design basis is still unresolved.
Review our qualifications and responsibility boundary and the installation systems we cover before defining the proposed scope.
Common questions
What information should I include in an installation inquiry?
Include the facility type, current design stage, relevant drawings and the installation question you need to resolve. State the design basis used and attach available Chinese review comments or product documents. This gives the discussion a defined scope and helps separate installation coordination from issues that require a decision by the project designer.
Can I send drawings prepared to ASCE 7 for discussion?
Yes. Send the relevant drawings with their stated design basis and any Chinese review comments. They can support an installation-scope discussion, but they do not establish Chinese compliance. The project designer must review the applicable Chinese requirements and issue the accepted design details before the affected construction proceeds.
Can Liangjia confirm that my project will pass Chinese review?
No. We cannot guarantee design approval or acceptance by the project’s reviewers. We can discuss our installation scope and provide applicable product evidence and construction records. The project designer resolves engineering compliance, while the project’s review and acceptance arrangements determine the required approvals, inspections and authorized signatures for the work.
Use the direct contact details above.
Email your project question to info@ahliangjia.com, or call the listed number.
View contact details